On December 19, 2024, at the production site of JSC Teplokhim, control tests of the secondary cooler of the excess fuel gas compressor and the regenerated amine refrigerator, manufactured by the enterprise as part of the import substitution program for the largest LNG project in the country, were completed.
The unique design of the equipment was designed taking into account modern technologies and requirements of international standards. In the process of designing the devices, the engineering core of the enterprise carried out large-scale work to adapt foreign standards to the requirements of Russian standards and the customer, as well as the specifics of operating conditions.
Tripartite tests were carried out jointly with representatives of the customer, designers and independent experts of the project’s supervisory authorities. At each stage of equipment testing, specialists paid special attention to the quality of assembly, compliance with the declared technical parameters and safety indicators. The test results satisfied the experts, once again confirming the high level of domestic production.